1. Must check before starting the daily maintenance matters is in accordance with the requirements;
2. Open the motor, if the oil temperature at 20 ℃ below, must be the motor ticking over half an hour (no load), the oil temperature up to 25 ℃ can start normal production;
3. Not mold-shut finish it is forbidden to shoot into, in order to avoid material tube mould crashed;
4. The material pipe temperature failed to reach the set temperature, it is forbidden to turn the screw and scored, and shoot back;
5. Turn the screw injection when feeding must delay between 0.5 seconds, or reduce the service life of the screw;
6. Do not make metal debris fall into the feeding tube, to avoid feeding tube in damage;
7. Must want to import the cooling water cooler, ensure normal molding conditions;
8. Do not remove the safety cover or the machine under the case of safety switch operation;
9. Stop before the material of the tube must be plastic injection, rubber screw pump to feed location;
10. Stop before it is strictly prohibited to will die closed completely, lest four the elder brother Lin Zhu (rod) tensile fatigue, reduce the service life;
11. Stop before the shoot will be turned back, feed tube nozzle shall not touch the mould;
If you have any question,pls do not hesitate to contact with me.
Posted by Fancy