Daily maintenance of injection molding, routine maintenance of injection molding.

For daily maintenance of injection molding, please pay attention followings:

(1) Examination before using1. Before using the injection molding, we should examine the qualification whether it is suitable for the industry.2. To check the equipment whether it is suitable with injection molding3. The operator should have detailed information of the injection molding performance and be familiar with operation method.

(2) Examining injection molding during the process1. The operation place must be clean. Inside the mould, it should have no dust.2. When using the injection molding, we should obey the rules.3. When try the mould, the first sets of products should be examined carefully.4. During the working process, we should examine the injection molding conditions. If we find some dust in the mould, then we should do the maintenance of the injection molding.

(3) Examination after using1. After using, we should unload the injection mould from the machine under the operating rules.2. When swing the injection mould, we should put down it carefully. After unloading the injection mould, we should clean the injection mould.

Posted by Nancy

Daily maintenance of injection molding

Daily maintenance of injection molding, routine maintenance of injection molding.

For daily maintenance of injection molding, please pay attention followings:

(1) Examination before using1. Before using the injection molding, we should examine the qualification whether it is suitable for the industry.2. To check the equipment whether it is suitable with injection molding3. The operator should have detailed information of the injection molding performance and be familiar with operation method.

(2) Examining injection molding during the process1. The operation place must be clean. Inside the mould, it should have no dust.2. When using the injection molding, we should obey the rules.3. When try the mould, the first sets of products should be examined carefully.4. During the working process, we should examine the injection molding conditions. If we find some dust in the mould, then we should do the maintenance of the injection molding.

(3) Examination after using1. After using, we should unload the injection mould from the machine under the operating rules.2. When swing the injection mould, we should put down it carefully. After unloading the injection mould, we should clean the injection mould.